Shopping mall temporary installation


Warning: A non-numeric value encountered in /home/lullinch/public_html/wp-content/plugins/slider-image/slider.php on line 2251

Four giant columns and one center desk set in one of the most stunning shopping malls in the world, installed in less than 36 hours. LED lighting completely controlled by wireless DMX protocol.
Our role on the project:

  • -Part of engineering.
  • -Complete lighting engineering.
  • -Complete lighting installation.
  • -Installation on site.

This project has been realized when I was working for Artis GmbH


Photo credits: Artis GmbH

Scroll to Top

Lullin engineering is offering an all-in-one integration service for industrial robots specialized in the wood, steel and glass machining industry.

Site Navigation