Warning: A non-numeric value encountered in /home/lullinch/public_html/wp-content/plugins/slider-image/slider.php on line 2251
A KUKA KR120 HA with turntable had to be transported from Germany to Switzerland, complete operation lasted less than one week
Our role on the project:
- -Global relocation coordination
- -Complete removal and re-installation of all components
- -Complete re-calibration of the cell
Photo credits: Lullin Engineering