Unbeatable price/quality solution for insulation and protection for sensitive devices, made out of wood and osb panels. Installation time under 6 days for a 115 sqm building, with a 4 meter high ceiling. Energy required for heating with a 15 degrees delta (inside-outside) is under 2 kW
- Heat exchanger
- Heating central
- LED lightning overall
- 5 doors
- 120mm insulation with steam barrier
- On site assembly
- Construction cost around 250 CHF / USD per squared meter (as an example for the parameters above).
Photo credits: Lullin Engineering