Warning: A non-numeric value encountered in /home/lullinch/public_html/wp-content/plugins/slider-image/slider.php on line 2251
A KUKA KR60 HA has been installed with a “simple” task, to cut glas with a +/- 0.1mm tolerance. Complete conception, part list, installation was achieved in less than 20 work days
Our role on the project:
- -Global Cell conception
- -Installation of all components and hardware
- -Synchronization between all devices
- -Wiring and electrical installation
- -Plumbing and air pressurized air installation
- -Dual PLC setup (milling unit and Safety management)
- -Instruction & Workshop to the future users
Photo credits: Lullin Engineering